Panama
This rehabilitation project for the Puente de las Américas consisted of the execution of studies, investigations, designs and the preliminary calculations necessary to carry out the concrete slab and floor beams replacement, relocation of public utilities that may be affected in this process, rehabilitation of the metallic structure of the arch and of the rest of the superstructure and substructure and painting the complete bridge. CSA was responsible for the Environmental Impact Assessment, Structural, Roadway and MEP Design and Construction Management Support.