Empire State Building Broadcasting Urgency & Other Building Renovations / Upgrades / Fit-Outs

New York, NY

EMPIRE STATE BUILDING Renovations/Upgrades/Fit-Outs

New York, NY

CSA Group contributed to resolving the broadcasting urgency that disrupted all radio broadcasting, regular television and cellular calls within the New York Metro Area that occurred on September 11, 2001.  CSA provided the design of M/E/P systems and construction support services for the Channel 11 (WPIX) DTV and VHS Transmitter site at the World Trade Center. The situation impacted all major broadcasters in the industry, to get  broadcasting  up and running.  The immediate response and proactive involvement of our project managers and engineers were critical in dealing with the negotiations and technical issues related to obtaining and distributing any available amperage to the Empire State Building.

CSA provided M/E/P Engineering design and construction support services for:

  • 2nd, 80th, 85th, 86th, and 102nd Floor Observatories 
  • Fit-Out renovations for CW11 WPIX Transmitter Suite, SHOWTIME and ABC Radio
  • 25th, 77th, 84th, 87th floors for various renovations/upgrades
  • Various Conference Rooms & IT Air Conditioning for ESB Management
  • HVAC Condenser Water Study
  • Chipotle, Heartland Brewery & Café Europa Restaurants – HVAC exhaust renovations