Panama
The Project consisted the execution of studies, design and construction of a viaduct at the intersection of Omar Torrijos Avenue and Andrews Drive, in Albrook, and the relocation of public services affected by the construction. CSA engineering services included Environmental, Geotechnical, Drainage, Structural and Surveying.